# Safety Process
|
||
|
Streamlining Development Assurance - muXAV Use Case
|
||
|
|
||
|
In this folder, the artefacts of the following ARP 4761 activities,
|
||
|
applied to muXAV's development, will progressively be made available:
|
||
|
|
||
|
|
||
|
- Functional Hazard Analysis at air vehicle level
|
||
|
- FDAL assignement
|
||
|
- Fault Tree Analysis of each Failure Condition
|
||
|
- Preliminary AV architecture Safety Assessment
|
||
|
- IDAL assignement
|
||
|
|
||
|
- Functional Hazard Analysis of Electric Propulsion System (EPS)
|
||
|
- FDAL assignement
|
||
|
- Fault Tree Analysis of each EPS Failure Condition
|
||
|
- Preliminary EPS's architecture Safety Assessment
|
||
|
- IDAL assignement
|
||
|
|
||
|
- Functional Hazard Analysis of Hydraulic Braking System (HBS)
|
||
|
- FDAL assignement
|
||
|
- Fault Tree Analysis of each HBS Failure Condition
|
||
|
- Preliminary HBS's architecture Safety Assessment
|
||
|
- IDAL assignement
|
||
|
|
||
|
- Functional Hazard Analysis of Mission Management System (MMS)
|
||
|
- FDAL assignement
|
||
|
- Fault Tree Analysis of each MMS Failure Condition
|
||
|
- Preliminary MMS' architecture Safety Assessment
|
||
|
- IDAL assignement
|
||
|
|
||
|
|
||
|
As of 2016/09/20 the folder is empty.
|
||
|
|
||
|
See the Specification folder.
|