# Experiments on Overarching Properties (OPs) |
||||||
|
*Streamlining Development - Assurance muXAV Use Case* |
||||||
|
|
||||||
|
|
||||||
|
This folder will contain any development artefact or assurance artefact |
||||||
|
supporting the experiments with the OPs on muXAV development proccesses. |
||||||
|
|
||||||
|
As of 2016/09/20 the folder is empty. |
||||||
|
|
||||||
|
See the Specification folder. |
@ -0,0 +1,11 @@ |
|||||||
|
# Experiments on Baseline Development Assurance |
||||||
|
*Streamlining Development Assurance - muXAV Use Case* |
||||||
|
|
||||||
|
|
||||||
|
This folder will contain any development artefact or assurance artefact |
||||||
|
supporting application of ARP 4754A, DO-178C, DO-331 (model-based TS), DO-333 |
||||||
|
(formal method TS), DO-254 on muXAV development processes |
||||||
|
|
||||||
|
As of 2016/09/20 the folder is empty. |
||||||
|
|
||||||
|
See the Specification folder. |
@ -0,0 +1,35 @@ |
|||||||
|
# Safety Process |
||||||
|
Streamlining Development Assurance - muXAV Use Case |
||||||
|
|
||||||
|
In this folder, the artefacts of the following ARP 4761 activities, |
||||||
|
applied to muXAV's development, will progressively be made available: |
||||||
|
|
||||||
|
|
||||||
|
- Functional Hazard Analysis at air vehicle level |
||||||
|
- FDAL assignement |
||||||
|
- Fault Tree Analysis of each Failure Condition |
||||||
|
- Preliminary AV architecture Safety Assessment |
||||||
|
- IDAL assignement |
||||||
|
|
||||||
|
- Functional Hazard Analysis of Electric Propulsion System (EPS) |
||||||
|
- FDAL assignement |
||||||
|
- Fault Tree Analysis of each EPS Failure Condition |
||||||
|
- Preliminary EPS's architecture Safety Assessment |
||||||
|
- IDAL assignement |
||||||
|
|
||||||
|
- Functional Hazard Analysis of Hydraulic Braking System (HBS) |
||||||
|
- FDAL assignement |
||||||
|
- Fault Tree Analysis of each HBS Failure Condition |
||||||
|
- Preliminary HBS's architecture Safety Assessment |
||||||
|
- IDAL assignement |
||||||
|
|
||||||
|
- Functional Hazard Analysis of Mission Management System (MMS) |
||||||
|
- FDAL assignement |
||||||
|
- Fault Tree Analysis of each MMS Failure Condition |
||||||
|
- Preliminary MMS' architecture Safety Assessment |
||||||
|
- IDAL assignement |
||||||
|
|
||||||
|
|
||||||
|
As of 2016/09/20 the folder is empty. |
||||||
|
|
||||||
|
See the Specification folder. |
@ -0,0 +1,12 @@ |
|||||||
|
# Specification of the product to be developed |
||||||
|
*Streamlining Development Assurance - muXAV Use Case* |
||||||
|
|
||||||
|
This folder contains the specification of a toy drone named muXAV (micro |
||||||
|
Uninhabited Air Vehicle) intended to support experiments on various ways of |
||||||
|
performing development assurance. |
||||||
|
|
||||||
|
As of 2016/09/20 the folder contains only the |
||||||
|
RESSAC_CaseStudy_muXAV_Specification.docx and the |
||||||
|
RESSAC_UseCase_FAA_Dallas2016_09_15.ppt files. |
||||||
|
|
||||||
|
A Modelica model implementing the DIF part of the document is planned for fall of 2016. |