# Experiments on Overarching Properties (OPs)
|
||||
*Streamlining Development - Assurance muXAV Use Case*
|
||||
|
||||
|
||||
This folder will contain any development artefact or assurance artefact
|
||||
supporting the experiments with the OPs on muXAV development proccesses.
|
||||
|
||||
As of 2016/09/20 the folder is empty.
|
||||
|
||||
See the Specification folder.
|
||||
Binary file not shown.
BIN
CaseStudiesProcessDefinition/Case study SPARK.doc
Normal file
BIN
CaseStudiesProcessDefinition/Case study SPARK.doc
Normal file
Binary file not shown.
BIN
CaseStudiesProcessDefinition/Case study SW MODEL.doc
Normal file
BIN
CaseStudiesProcessDefinition/Case study SW MODEL.doc
Normal file
Binary file not shown.
@@ -1,35 +0,0 @@
|
||||
# Safety Process
|
||||
Streamlining Development Assurance - muXAV Use Case
|
||||
|
||||
In this folder, the artefacts of the following ARP 4761 activities,
|
||||
applied to muXAV's development, will progressively be made available:
|
||||
|
||||
|
||||
- Functional Hazard Analysis at air vehicle level
|
||||
- FDAL assignement
|
||||
- Fault Tree Analysis of each Failure Condition
|
||||
- Preliminary AV architecture Safety Assessment
|
||||
- IDAL assignement
|
||||
|
||||
- Functional Hazard Analysis of Electric Propulsion System (EPS)
|
||||
- FDAL assignement
|
||||
- Fault Tree Analysis of each EPS Failure Condition
|
||||
- Preliminary EPS's architecture Safety Assessment
|
||||
- IDAL assignement
|
||||
|
||||
- Functional Hazard Analysis of Hydraulic Braking System (HBS)
|
||||
- FDAL assignement
|
||||
- Fault Tree Analysis of each HBS Failure Condition
|
||||
- Preliminary HBS's architecture Safety Assessment
|
||||
- IDAL assignement
|
||||
|
||||
- Functional Hazard Analysis of Mission Management System (MMS)
|
||||
- FDAL assignement
|
||||
- Fault Tree Analysis of each MMS Failure Condition
|
||||
- Preliminary MMS' architecture Safety Assessment
|
||||
- IDAL assignement
|
||||
|
||||
|
||||
As of 2016/09/20 the folder is empty.
|
||||
|
||||
See the Specification folder.
|
||||
BIN
UseCaseData/Layer2_MMS_SW_SPARK/mms.o
Normal file
BIN
UseCaseData/Layer2_MMS_SW_SPARK/mms.o
Normal file
Binary file not shown.
BIN
UseCaseData/Layer2_MMS_SW_SPARK/types.o
Normal file
BIN
UseCaseData/Layer2_MMS_SW_SPARK/types.o
Normal file
Binary file not shown.
Some files were not shown because too many files have changed in this diff Show More
Reference in New Issue
Block a user